Project Title: ABU DHABI INTERNTAIONAL AIRPORT (MTB)
Place: UAE
Scope of Work: Supply of Gr.8.8 / 10.9 Bolts/Nuts/Studs
Year: 2015
Description:
Rough seas, precarious terrains– you operate major extraction platforms in the harshest environments while using increasingly technically complex equipment. The stresses upon performance are acute.
Should parts and systems fail while extracting, storing or transporting natural gas and oil resources, both the economic and environmental costs would be crippling. For this reason LoneStar components are optimised to meet, and often exceed, both your needs and expectations.
http://www.adac.ae/